How checks work
Every check is reported as demand ÷ capacity, with the combination, the clause and the working.
A check compares what the structure must carry (the demand) with what the code allows it to carry (the capacity). The studio reports the ratio demand ÷ capacity, so every check reads the same way: 0.80 has 20 % in hand, 1.00 is exactly at the limit, and anything above 1.00 fails.
Next to each ratio you see the load combination that produced it, the clause it comes from and the working — the intermediate values a checker would want. The check with the highest ratio governs. A design passes only when every check does; there is no averaging and no partial pass.
- The footing FEM cross-check analyses the designed footing as a plate on tensionless springs, or a strip as a beam on springs. A plate’s moments usually come out 3–8 % above the rigid method because of the twisting term, so the result is shown for review, flagged when it disagrees, and never changes pass or fail — the codes design footings by the rigid method.
- In Site Plan, crack-width checks are review-only, and a footing whose worst ratio is between 1.00 and 1.05 is flagged as marginal for you to judge.
- Input hints flag unusual values in amber and impossible ones in red as you type. They explain; they never block a run.
Something missing or wrong? Tell us from the changelog page or the feedback button.