How the design search works

How a footing, pile cap or retaining wall is sized — and why the result is the cheapest that passes, not merely one that passes.

When you leave a size blank, the engine searches rather than guesses. For an isolated footing it lays out up to twelve plans — equal overhangs and aspect ratios up to your longest L:B, on your size step — and for each finds the least depth that passes and the lightest bars that work. A crack-width failure is fixed with more bars before the footing is made deeper.

Plans that fail are dropped, and the cheapest plan that passes is chosen. Costs here are only an illustration.

Pad against sloped is then decided on total cost: concrete, steel, shuttering, excavation, backfill and blinding, at rates you can change. A plan with equal overhangs is preferred when it costs within 3 % of the cheapest, because it is easier to set out and less likely to be built wrong.

Every passing option is returned, not just the winner. Checking any option as given reproduces exactly the governing ratio the search reported — the search and the check are the same engine.

Pile caps and retaining walls

  • A pile cap takes the fewest piles that work, then the least depth, then the lightest bars. Its cost includes the piles.
  • A retaining wall’s Size it for me varies the base width, the split between toe and heel, the base and stem thicknesses and an optional key, and keeps the cheapest wall with every check passing, plus up to 15 alternatives. Re-running the chosen wall through the design gives the same governing ratio.

Something missing or wrong? Tell us from the changelog page or the feedback button.