Foundation Design
Footings under one column, a schedule of columns, or a whole site.
IS 456, ACI 318, EC2; AS 3600 and CSA A23.3 on Single Column
Open Foundation DesignSingle Column designs or checks pads, sloped pads, strips under walls, plain concrete pads, combined footings under 2–6 columns in a line (two columns: a rectangle or a trapezoid with its centroid under the loads — for the heavier column at a property line), and pile caps on 1–9 piles. Footing Schedule designs a list of columns at once. Site Plan places and designs every footing on a plot.
Open it at /civiltechstudio/foundation-design/app. Status: live.
Design footings for four 400 × 400 mm columns in one run on 150 kN/m² soil, and let the schedule group them into drawing marks.
- Select the Footing Schedule tab.
- In the Design basis bar, choose
IS 456, enter SBC150kN/m² with the basis net (report), set Founding to1.5m, and pickM25concrete andFe500steel. - Under Column schedule, select Clear, then select Add column three times. The rows are labelled C1 to C4.
- Under Load (kN), enter the service axial loads: C1
500, C2800, C3800, C41100. These loads are unfactored. - Open Assumptions and set Col b (mm) and Col d (mm) to
400. - Select the button under the table, which now reads
Design 4 footings.
- IS 456:2000, ACI 318-19 and EN 1992-1-1 (Eurocode 2) — every footing type and mode.
- AS 3600:2018 (with AS/NZS 1170.0) and CSA A23.3-19 (with NBCC 2020) — reinforced pads, sloped pads, strips, combined footings and pile caps, on the Single Column tab only.
- Load combinations per IS 875 / IS 456, ASCE 7-16 and EN 1990, in three families: service (soil), strength (concrete) and stability.
- Design basis: code, SBC and its basis (net or gross), founding depth, concrete, steel, cover.
- Column or wall size, and offsets for an edge column.
- Load cases Dead, Imposed, Snow, Wind and Earthquake, each with P, Mx, My, Hx, Hy — unfactored, at the top of the footing.
- Optional: your own combinations, soil unit weight, water table, base friction, passive resistance, crack-width limit, cost rates, plan grid step and longest L:B.
- Pile caps: pile diameter, safe compression, uplift and lateral loads, spacing and edge distance.
- Every check as demand ÷ capacity, with the combination, the clause and the working.
- Soil pressure from a tensionless biaxial solution; 3D model; strip shear and moment diagrams for any strength combination.
- Options explorer: up to 12 plans weighed, plotted by cost against governing ratio.
- FEM cross-check of the designed footing — a plate on soil springs, or a beam on springs for a strip — beside the rigid result and flagged when they disagree (for review; never changes pass or fail).
- Deep pile caps: a Strut-and-tie (deep cap) result group (struts, nodes, ties, anchorage). The ties (truss method, T = P·arm/z) are statics and always held — the design adds bars until they pass, and the notes say whether the tie or bending governs the bars. Under AS 3600 the struts and nodes govern too; under the other codes, where they fail but the sectional shear passes, the sectional shear is the check and the struts and nodes are shown for review. 3-pile caps: the triangle's truss — struts to one node at the column, the side ties by joint equilibrium, each resolved into the X and Y bars over its piles — so every tie, both ways, is carried by the bars.
- Bar-bending schedule (BBS tab), excavation, comparison and sensitivity tabs.
- Exports: calculation PDF, vector PDF, executive summary PDF, Excel, JSON; pile-cap DXF. Site Plan adds CSV, Excel, IFC, an FEM calculation report and DXF drawing sheets.
- AS 3600 and CSA A23.3 do not cover plain pads, the Other types, the Footing Schedule or Site Plan.
- Strap footings are designed in the Site Plan, which ties each column at the plot edge to the column it leans on; Other types runs the earlier cascade engine with one service load.
- Not modelled: trapezoidal footings under three or more columns, pile-group efficiency. The 3D view draws a trapezoid as its bounding rectangle.
- Site Plan: a corner column flush with two boundaries needs a two-way strap or tie-beam grid, which is not designed — it fails with that remedy named.