List a building element by element and get the concrete, a bar bending schedule with real cutting lengths, the materials and a priced bill of quantities — then the complete building cost.

What it does
Enter columns, beams, slabs, footings, walls, stairs, sunshades and openings, each with a count × floors multiplier and its bars, or start from a five-line brief or an IFC model. You get a measurement sheet, a bar bending schedule with shape codes, concrete by mix and level, cement, sand and aggregate, rebar by diameter and a coded BOQ with a rate analysis behind every line. Masonry, plaster, flooring, painting and services then complete the building cost, with a per-sq-ft back-check.
Columns, beams, slabs, footings, walls, stairs, sunshades and openings, each with count × floors and its own bars.
Cutting length = clear length + anchorage + hooks + laps − bend deductions, with shape codes a bar bender can work from.
Gross concrete by mix and by level, cement bags, sand, aggregate, and rebar by diameter with wastage.
Every line has an item number and a rate analysis. Import a DSR or state SOR and apply a cost index.
Masonry, plaster, flooring, painting, doors and windows, plumbing and electrical, with cost by trade and a per-sq-ft back-check.
Steel intensity outside the usual kg/m³ band for the member type, missing reinforcement, oversize bars and excessive laps.
How it works
A quick-start brief (area per floor, floors, use, place, specification), an IFC model, a template, or the member tables.
Sizes, counts and bar layouts; then laps, hooks, wastage, mixes and rates.
Measurement sheet, bar bending schedule, materials, BOQ with rate analysis and the cost by trade.
Estimate PDF, Excel workbook, tender BOQ and BBS as PDF or CSV; then cash flow, purchases, bids, RA bills and variations.
See it in action
Standards
Every result cites the clause it came from, so a reviewer can follow the same path you did.
Bar shape codes in the bar bending schedule: 00 straight, 11 and 21 bent bars, 51 closed link
Cement in the material take-off held at the 450 kg/m³ cap
Openings deducted from plaster the way IS 1200 measures them
BOQ lines carry Schedule-of-Rates item codes; import your own rate library
Who it’s for
A rural or semi-urban RC building priced from its members, finishes and services.
A coded BOQ with rate analysis, a tender BOQ and a proposal for the client.
Cutting lengths and shape codes by member, ready for the bar bender.
See whether a lump-sum or per-sq-ft quote stands up against an itemised take-off.
Plans
Sign up free to run designs. Upgrade for unlimited runs, clean reports and the advanced analyses.
| Feature | Free₹0 | Professional₹2,999/mo · 14-day free trial |
|---|---|---|
| Saved projects | 20 projects | 50 projects |
| PDF design reports | Watermarked | Clean, with your logo |
| API access | Not included | Included |
FAQ
Something else? Open RC Building Estimator and try it with your own numbers.
Cutting length = clear length + anchorage at the supports + hook allowances + laps (one per stock bar length) − bend deductions. A rectangular link is its perimeter plus two hooks, less 6 bar diameters of bend deduction for its three 90° corners at 2d each; the hook allowance already includes its own bend. Anchorage, hook and lap lengths are set in bar diameters and can be edited.
Weight in kg/m = d² / 162.2, with d the bar diameter in mm, so a 12 mm bar weighs 0.888 kg/m. The estimator uses this for every line of the bar bending schedule, totals the steel by diameter, and adds wastage in the BOQ only.
For a nominal mix the estimator multiplies the wet volume by a dry factor of 1.54 and takes one 50 kg bag as 0.0347 m³. An M20 (1:1.5:3) mix therefore needs 1.54 ÷ 5.5 ÷ 0.0347 ≈ 8.1 bags per m³. Richer mixes are held at 450 kg/m³ (9 bags), the limit in IS 456 Cl 8.2.4.2.
The estimator divides the building total by the built-up area of all floors and reports the cost per sq ft beside the cost by trade. Compare it with the rate you would quote. The rates are indicative, so edit them for your place before you rely on the figure.
Yes. The rate library imports a schedule — a DSR, a state SOR or your own — and an item number on a BOQ line fills in its description, unit and rate. A cost index such as “DSR + 12 %” is applied over the schedule’s rates.
Yes. The quick start takes the area per floor, the number of floors (up to G+9), the use, the place and the specification. It lays out a grid, sizes the members by IS 456 span/depth rules of thumb and an axial-load check, and adds walls, openings, a stair and finishes. The sizes are preliminary — refine them before you rely on the estimate.
Guides
RCC building estimate calculation step by step: concrete volume, shuttering, bar bending schedule cutting lengths, steel kg (d²/162), cement bags, excavation and a priced BOQ, worked for a G+1 frame with every number checked.
Read · 17 minHow many bags of cement and how much sand and aggregate go into 1 m³ of M20 or M25 concrete: the 1.54 dry volume method compared with a design-mix table.
Read · 8 minHow to use an online IFC viewer for real BIM work: open IFC2x3, IFC4 and IFC4x3 models in the browser, federate disciplines, cut sections and storey plans, raise BCF 2.1/3.0 issues, take off quantities and share a private client link.
Read · 11 minBihar building bye-laws setback and FAR rules from the 2014 bye-laws as amended in 2022 and 2025: Tables 8, 9, 15 and 16, the 1.5 × (road + setback) height rule, the 800 m² high-rise limit and Table 19 parking, worked for a 12 × 18 m plot.
Read · 18 minList a building element by element and get the concrete, a bar bending schedule with real cutting lengths, the materials and a priced bill of quantities — then the complete building cost.
Free account — no card required
Sign up to save projects, export PDFs, and access all design tools.