Enter your plot, its roads and the building you plan, and get a clause-cited pre-check of setbacks, FAR, ground coverage, height and parking under the Bihar, Jharkhand, Uttar Pradesh or Delhi bye-laws.

What it does
The checker reads the setbacks from your state’s own tables, draws the buildable envelope with north up, and checks ground coverage, FAR, height, floor count, access road, minimum plot size, parking, the high-rise trigger and any site constraints you declare. Every result cites its clause, and a rule not transcribed for your state is named as not checked rather than passed. Bihar is gazette-verified; Jharkhand, Uttar Pradesh and Delhi are labelled “beta — partial, verify against gazette”.
The buildable envelope on screen, north up, and as a dimensioned DXF setback plan.
Each checked against the state’s limit with its clause; FAR-free stilt, basement and service floor modelled.
No diagonal measured? It closes the plot from the deed area or a corner angle and tells you how much the answer moves.
HT line, drain, river, water body, railway or road widening — the widening strip is deducted before setbacks.
An itemised sanction-fee estimate (marked unknown where a state does not publish rates), the document checklist and, in Bihar, Trust & Verify eligibility.
For a building already built: are the deviations condonable, and if so, what is the compounding fee.
How it works
Four side lengths, the compass direction of each side, the width of every road it faces, and one fact that closes the shape.
State, occupancy, floors, height, FAR-free elements and any site constraints.
Setbacks, coverage, FAR, height, floors, road width, plot size and parking — each with its clause and how to fix it.
Download the DXF setback plan and the PDF report with the fee estimate, or upload your site-plan DXF to check it against the envelope.
See it in action
Standards
Every result cites the clause it came from, so a reviewer can follow the same path you did.
As amended in 2022 and by UDHD Notification 10713 of 4 October 2025 — gazette-verified
With amendments to 2024 — draft, verify against gazette
Model Building Construction & Development Byelaws 2025 as amended 21-11-2025, Development Authority areas — draft
Unified Building Bye-laws 2016 with 2021 amendments — draft, verify against gazette
Who it’s for
See how much you can build on it, and how high, before you commit.
Fix the setbacks and FAR first, then draw inside the envelope.
Find out whether a deviation can be regularised and what compounding would cost.
Send the permitted floors and area to the RC Building Estimator for a first cost.
Plans
Sign up free to run designs. Upgrade for unlimited runs, clean reports and the advanced analyses.
| Feature | Free₹0 | Professional₹2,999/mo · 14-day free trial |
|---|---|---|
| Saved projects | 20 projects | 50 projects |
| PDF design reports | Watermarked | Clean, with your logo |
| API access | Not included | Included |
FAQ
Something else? Open Building Bye-laws Compliance and try it with your own numbers.
It depends on the plot’s depth and width and on the building height. Under By-law 35 of the Bihar Building Bye-laws 2014, Table 8 sets the front and rear setbacks by average plot depth and Table 9 the side setbacks by average plot width, each in height bands up to 10 m, 12 m and 16 m (as amended in 2022). Enter the plot and the checker reads the right row and draws the envelope.
By-law 39(1)(A), as substituted in 2022, limits height to 1.5 × (road width + front setback) for plots on a road at least 9.10 m wide. Where a plot abuts streets of different widths, the greater width governs (39(1)(B)). The checker tests the height against both this formula and the height band of the setback tables.
Under By-law 40 and Table 19 as amended in 2022, a residential building up to 200 m² of built-up area needs 1 ECS and one of 200–300 m² needs 2 ECS. Above 300 m², parking of 25 % of the built-up area is required. The checker reports the requirement with its clause.
Under By-law 8 (2022), a low-risk building — residential, up to 10 m (G+2), on a plot up to 300 m² — may start construction on submission of the plans, fees and affidavit, and the ULB inspects within 15 days. Higher-risk buildings must wait for sanction. The checker tells you which route your scheme falls in.
Partly. By-law 76(3)(C) lets a side or rear setback deviation of up to 10 %, FAR up to 5 % and height up to 5 % (at most 0.90 m) be condoned on payment of a compounding fee (By-laws 76–78, Table 25). The front setback is never condonable: By-law 76(1) lists it among the deviations that cannot be compounded. Regularisation mode tells you which case you are in and refuses to quote a fee where the works cannot be compounded.
No. It is a pre-check to get the scheme right before you submit it. Bihar’s tables are gazette-verified; the other states are labelled draft, and any rule not transcribed is listed as not checked. Verify the values with the sanctioning ULB or authority before submission.
Guides
Bihar building bye-laws setback and FAR rules from the 2014 bye-laws as amended in 2022 and 2025: Tables 8, 9, 15 and 16, the 1.5 × (road + setback) height rule, the 800 m² high-rise limit and Table 19 parking, worked for a 12 × 18 m plot.
Read · 18 minHow to use an online IFC viewer for real BIM work: open IFC2x3, IFC4 and IFC4x3 models in the browser, federate disciplines, cut sections and storey plans, raise BCF 2.1/3.0 issues, take off quantities and share a private client link.
Read · 11 minRainwater harvesting pit design step by step: annual harvest, rational-method storm inflow, recharge pit size from filter porosity and soil infiltration, and the 24-hour drain-down check, with a 150 m² roof worked example.
Read · 12 minEnter your plot, its roads and the building you plan, and get a clause-cited pre-check of setbacks, FAR, ground coverage, height and parking under the Bihar, Jharkhand, Uttar Pradesh or Delhi bye-laws.