Log each pour’s 7- and 28-day cube results and check them against the IS 456 Clause 16 acceptance criteria — individual results and 4-group means — as the register fills.
What it does
Each pour is a sample whose 28-day result is the mean of its cubes. The register rejects samples with fewer than 3 cubes or a cube outside ±15 % of the sample average (Cl 15.3/15.4), checks every valid result against fck − 3 and every group of 4 non-overlapping consecutive results against fck + 0.825σ or fck + 3, whichever is greater (Table 11 as amended), and flags pours whose 7-day strength lags the expected trend.
ID, element, date, 28-day cubes and optional 7-day cubes for each pour — or paste the rows straight from Excel or CSV.
Fewer than 3 cubes, or a cube outside ±15 % of the average: the sample is flagged and kept out of acceptance.
Each result against fck − 3; each group of 4 consecutive results against fck + 0.825σ (to the nearest 0.5) or fck + 3, whichever is greater.
Table 8 value as a floor below 30 results, the register’s own SD from 30 results, or an established site SD you enter.
Give a total quantity of 30 m³ or less and the mean of all results is checked against fck + 4, each result against fck − 2.
Pours whose 7-day mean lags the expected early strength are flagged; a control chart plots every result against fck and both limits.
How it works
Concrete grade (M15 to M50), the expected 7-day fraction, an established SD if you have one, and the total quantity if it is small.
Add each pour with its element, date and cube strengths, or paste the register from a spreadsheet.
Individual and group limits, invalid samples and 7-day flags, with the SD used and where it came from.
Verdict, per-pour register and control chart. Save the register or export it as JSON.
See it in action
Standards
Every result cites the clause it came from, so a reviewer can follow the same path you did.
Acceptance criteria — individual results and means of 4 non-overlapping consecutive results; Note 2 for 30 m³ or less
3 specimens per sample; a cube outside ±15 % of the sample average makes the result invalid
Assumed standard deviation until 30 results establish the site value
Method of test for compressive strength of concrete cubes
Who it’s for
Keep the cube register for a building’s pours and see each new result against the acceptance limits.
Check whether a run of ready-mix deliveries meets IS 456 before it is accepted.
A footing or slab of 30 m³ or less, judged under Table 11 Note 2.
See how sample results, standard deviation and the group criterion combine on real numbers.
Plans
Sign up free to run designs. Upgrade for unlimited runs, clean reports and the advanced analyses.
| Feature | Free₹0 | Professional₹2,999/mo · 14-day free trial |
|---|---|---|
| Saved projects | 20 projects | 50 projects |
| PDF design reports | Watermarked | Clean, with your logo |
| API access | Not included | Included |
FAQ
Something else? Open Cube Test Register and try it with your own numbers.
For M15 and above (IS 456 Table 11 as amended), every individual sample result must be at least fck − 3 N/mm², and the mean of each group of 4 non-overlapping consecutive results must be at least fck + 0.825 × the standard deviation (rounded off to the nearest 0.5 N/mm²) or fck + 3 N/mm², whichever is greater. A sample’s result is the average of its cubes. The register applies both checks as you add pours.
Three. IS 456 Cl 15.3 calls for 3 specimens per sample, and the sample result is their average. If any cube differs from that average by more than ±15 %, the result is invalid (Cl 15.4). The register flags such a sample and leaves it out of acceptance.
The assumed value from IS 456 Table 8: 3.5 N/mm² for M15, 4.0 for M20 and M25, and 5.0 for M30 to M50. The register uses it as a floor until it holds 30 results, then uses its own standard deviation. You can also enter an established site value.
IS 456 Table 11 Note 2 applies: the mean of all samples must be at least fck + 4 N/mm² and each individual result at least fck − 2 N/mm². A single sample must itself reach fck + 4. Enter the total quantity and the register uses Note 2 instead of the 4-group rule.
No. IS 456 acceptance is judged on 28-day results. The register flags a pour whose 7-day mean is below 0.9 × k × fck, where k is the fraction of fck you expect at 7 days (0.65 by default, editable), as an early warning to watch that pour’s 28-day result.
The register lists every result below the individual limit and every group below the mean limit as a non-conformance, and marks the register for review. A failed result is a prompt to investigate the concrete, for example with core tests, before deciding whether to accept it.
Guides
Concrete cube test acceptance criteria to IS 456 Cl 16 and Table 11 (as amended): the fck − 3 individual limit, the 4-result group mean, sampling frequency, invalid samples and a worked M25 register with ten pours.
Read · 15 minStep-by-step M25 concrete mix design to IS 10262:2019: target strength, w/c ratio, cement and aggregate quantities per m³, with hand calculation.
Read · 12 minLog each pour’s 7- and 28-day cube results and check them against the IS 456 Clause 16 acceptance criteria — individual results and 4-group means — as the register fills.
Free account — no card required
Sign up to save projects, export PDFs, and access all design tools.